Budgets Module

Budget vs. Actual

Set a spending or income target against a category or a project, and see it compared against your real records — pulled live every time you open the page, never typed in by hand.

Actuals from your real Income, Expenses & Projects records Access requires the Budgets module on your role

Setting a budget

1Create a budget line

Click + New Budget.

FieldNotes
Budget AgainstA Category or a Project — this choice can’t be changed later, see Changing a budgeted amount.
TypeCategory budgets only. Expenses or Income — decides which side of your books the category name is matched against.
CategoryCategory budgets only. A free-text field with autocomplete suggestions from categories you’ve already used. It has to match a real category name exactly, or Actual stays $0 — see How Actual is calculated.
ProjectProject budgets only. Picked from your real Projects list for the active company.
PeriodMonthly, Quarterly, or Annual.
Period StartAny date inside the month, quarter, or year you’re budgeting for — it snaps to that period’s full first-to-last-day range automatically.
Budgeted AmountRequired, must be greater than zero.

Click Create.

Project budgets ignore Period for Actual

For a category budget, Actual only counts records dated inside the period you set. For a project budget, Actual is that project’s real total cost to date, pulled straight from Projects — Period Start only labels the line, it doesn’t limit which costs are included.

2Read the summary cards

CardWhat it’s measuring
Total BudgetedSum of every budget line’s Budgeted Amount, for the active company.
Total ActualSum of every line’s real Actual, computed the same way as each row.
% UsedTotal Actual as a percentage of Total Budgeted, across all lines combined.
Over BudgetHow many individual lines are currently Over Budget.

These four cards sit above the Budget Lines table and always reflect every line you’ve created — there’s no filtering or date range to set.

3How Actual is calculated

Nothing about Actual, Variance, or a line’s health is ever stored — all three are recalculated from your real records the moment you open Budgets, so they can never drift out of sync with what’s actually in your books.

For a category line, Actual is the real income or expense total for that exact category name, within the period’s date range — the same numbers Reports itself would show for that category and period.

For a project line, Actual is the project’s real total cost to date, from Projects’ own cost tracking — see the note above for why the period doesn’t narrow this one.

Variance is Actual minus Budgeted (positive means you’ve gone over). Health is derived from the two — see Budget health reference.

Common tasks

Changing a budgeted amount

Click the edit icon on a budget line’s row.

Only the amount is editable

Once a budget line exists, Budget Against, Type, Category, Project, Period, and Period Start are all locked — the edit form shows them disabled. Only Budgeted Amount can actually be changed and saved. To retarget a line at a different category, project, or period, remove it and create a new one instead.

Removing a budget line

Click the delete icon on the row and confirm the prompt — there’s no undo after that. Removing a budget line only deletes the target you set; it never touches the real income, expense, or project records its Actual was calculated from.

Reference

Budget health reference

StatusMeaning
On TrackActual is under 85% of Budgeted.
At RiskActual has reached 85% of Budgeted, but hasn’t gone over.
Over BudgetActual has passed 100% of Budgeted — or the line has a $0 budget and any Actual at all.

What this module doesn’t do

Category has to match by name, exactly

There’s no picker linking a budget line to a real category record — it’s a free-text field matched against your Income/Expense category names. A typo or a slightly different name means Actual quietly stays $0 instead of erroring.

No alerts or notifications

A line crossing into At Risk or Over Budget only shows up the next time someone opens the Budgets page — it doesn’t fire a bell notification, email, or anything else on its own.

Separate from Projects’ own budget field

Projects already has its own per-project Budget/Spent tracking. A Budgets project line here sits alongside that, not in place of it — the two aren’t merged into one number.